North China and Northeast China Interprovincial Electricity Trade Dataset

This dataset supports modeling of hourly operations in the Northeast China Grid for the purpose of assessing winter system operations and resource adequacy under different extreme conditions.

  • Generator listing and operational characteristics (GEM)
  • Fossil fuel prices (CCTD)
  • Renewable energy availability (Renewables.ninja)
  • Inter-provincial transmission network
  • Provincial load profiles

This dataset also includes the corresponding simulation results under different extreme conditions.

  • Power dispatch
  • Renewable energy curtailment
  • Inter-provincial power flow
  • Utilization rate of inter-provincial transmission lines
  • Generation costs including startup cost, operational cost, and non-served energy cost
  • Non-served energy